50-State Construction Licensing Compliance Guide
An excavator truck digging on a work site
View Guide Contents
Guide Contents
Overview

Michigan Construction Licensing

A group of construction workers on site

Licenses are typically required for individuals and businesses that provide construction industry services. This guide contains information about construction industry licensing in Michigan.

Check Your Status For Free  Understand your current status and see recommended actions. Get Your Free  Harbor Compliance Score
Filter LicensesClear Filters
Company Licenses
(2)
(4)
(2)
(2)
(3)
(6)
(1)
(1)
(3)
(5)
(1)
(3)
(1)
(4)
Individual Licenses
(5)
(8)
(2)
(2)
(1)
(1)
(1)
(6)
(5)
(3)
(1)

Company Licenses

Michigan Construction and Contracting Company Licenses

Michigan Elevator Contractor License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Michigan Elevator Contractor License

Agency Fee:

$100

Registration Renewal

Form:

Michigan Elevator Contractor License Renewal

Agency Fee:

$50

Due:

Annually by December 31.

Michigan Fire Alarm Contractor License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Michigan Fire Alarm Contractor License

Agency Fee:

$300

Registration Renewal

Form:

Michigan Fire Alarm Contractor License Renewal

Agency Fee:

$300

Due:

Triennially by December 31.

Michigan Fire Alarm/Fire Suppression Firm License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Fire Services
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

BFS Certification New Firm Packet (BFS 76-77) & BFS Certification - Application for Qualifying Person - Fire Alarm/Fire Suppression Firm (BFS-77)

Filing Method:

Mail 

Agency Fee:

Certification Fee Schedule:
Full 3-year Cycle = $150.00
2nd year of a 3-year Cycle = $100.00
3rd year of a 3-year Cycle = $50.00

Notes:
  • Firms are certified for a standard three-year cycle, which coincides with mechanical and electrical contractor's license cycles:
    • Fire Alarm Firms = Current cycle January 1, 2019 - December 31, 2021
    • Fire Suppression Firms = Current cycle October 1, 2016 - September 30, 2019
  • Certification Fee Schedule:
    • Full 3-year Cycle = $150.00
    • 2nd year of a 3-year Cycle = $100.00
    • 3rd year of a 3-year Cycle = $50.00
  • If the firm has multiple branches in different locations, a separate certification is required for each branch office wishing to be certified. Please refer to the Certification Rules for more information.
Required Attachments:
  • A completed and Michigan notarized Application for Certification (BFS-76)
  • A completed and Michigan notarized Qualifying Person Affidavit for each qualifying person (BFS-77)
  • A notarized technical qualification resume and all supporting documentation (copies of licenses, certifications, training records, degrees, transcripts, etc.) for each qualifying person
  • The required fee based on the year in the current certification cycle

Registration Renewal

Form:

BFS Certification New Firm Packet (BFS 76-77) & BFS Certification - Application for Qualifying Person - Fire Alarm/Fire Suppression Firm (BFS-77)

Filing Method:

Mail 

Agency Fee:

Certification Fee Schedule:
Full 3-year Cycle = $150.00
2nd year of a 3-year Cycle = $100.00
3rd year of a 3-year Cycle = $50.00

Due:

Trienially by Decemeber 31.

Notes:
  • Firms are certified for a standard three-year cycle, which coincides with mechanical and electrical contractor's license cycles:
    • Fire Alarm Firms = Current cycle January 1, 2019 - December 31, 2021
    • Fire Suppression Firms = Current cycle October 1, 2016 - September 30, 2019
  • Certification Fee Schedule:
    • Full 3-year Cycle = $150.00
    • 2nd year of a 3-year Cycle = $100.00
    • 3rd year of a 3-year Cycle = $50.00
  • If the firm has multiple branches in different locations, a separate certification is required for each branch office wishing to be certified. Please refer to the Certification Rules for more information.

Michigan Maintenance and Alteration Contractor Company License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Filing Method:

Online

Agency Fee:

$150

Due:

Triennially by May 31.

Michigan Plumbing Contractor License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Filing Method:

Online

Agency Fee:

$300

Due:

Triennially

Michigan Residential Builder Company License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Notes:

Firms must have a representative apply for the individual license and then apply for the firm license.

Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Filing Method:

Online

Agency Fee:

$150

Due:

Triennially by May 31.

Michigan Sign Specialty Contractor License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Michigan Sign Specialty Contractor License

Agency Fee:

$200

Registration Renewal

Form:

Michigan Sign Specialty Contractor License Renewal

Agency Fee:

$40

Due:

Annually by December 31.

Michigan Type 1 Asbestos Abatement Contractor License

Agency:Michigan Occupational Safety and Health Administration - Asbestos Program
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Asbestos Abatement Contractor License Application

Filing Method:

Mail

Agency Fee:

$200

Registration Renewal

Form:

Asbestos Abatement Contractor License Application (Renewal)

Filing Method:

Mail

Agency Fee:

$100

Michigan Type 2 Asbestos Abatement Contractor License

Agency:Michigan Occupational Safety and Health Administration - Asbestos Program
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Asbestos Abatement Contractor License Application

Filing Method:

Mail

Agency Fee:

$400

Registration Renewal

Form:

Asbestos Abatement Contractor License Application (Renewal)

Filing Method:

Mail

Agency Fee:

$300

Local Construction and Contracting Company Licenses

Charter Township of Buena Vista Contractor License Registration

Agency:Charter Township of Buena Vista - Community Development Department (MI)
Foreign Qualification is Prerequisite:No
Insurance Requirements:

Worker's Compensation Insurance as required by MCL § 418.115.

Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Contractor License Registration

Filing Method:

Mail

Agency Fee:
  • $15 registration fee (Mechanical Contractors Only)
  • $10 registration fee (All Other Contractors)
Required Attachments:
  • State License
  • Certificate of Insurance

Registration Renewal

Form:

Contractor License Registration (Renewal)

Filing Method:

Mail

Agency Fee:
  • $15 renewal fee (Mechanical Contractors Only)
  • $10 renewal fee (All Other Contractors)
Due:
  • Annually by date of issuance (All licenses except Mechanical Contractors)
  • Mechanical Contractor Registration fee is charged once every three years for the term of the State License
Required Attachments:
  • State License
  • Certificate of Insurance

City of Detroit Awning & Canopy Erector License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Building Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Building License Registration or Renewal

Instructions:
  1. Call the Building Division to set up an appointment to take the necessary exam
  2. An applicant will be notified if they pass the exam and will then be required to pay the necessary license fee
Filing Method:
  • Mail
  • License fees can be paid online
Agency Fee:

$46

Notarize:Required

Registration Renewal

Form:

Buildings License Registration or Renewal

Filing Method:
  • Mail
  • License fees can be paid online
Agency Fee:

$46

Due:

Annually by date of issuance

Notarize:Required

City of Detroit Boiler Contractor Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Boiler/Pressure Vessel Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Boiler Contractor Registration

Filing Method:

Mail or in person

Agency Fee:

$22

Notarize:Required
Required Attachments:
  • State of Michigan Boiler Operator, Installer, or Repairer's License
  • Driver's License or State ID of the applicant

Registration Renewal

Form:

Boiler Contractor Registration

Filing Method:

Mail or in person

Agency Fee:

$22

Due:

Triennially by associated state-level license renewal

Notarize:Required
Required Attachments:
  • State of Michigan Boiler Operator, Installer, or Repairer's License
  • Driver's License or State ID of the applicant

City of Detroit Electrical Contractor License & Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:

The applicant must hold a current and valid Master Electrician's License or hire a current and valid Master Electrician who will be employed full time by the applicant. The Master Electrician shall be actively in charge of and responsible for Code compliance of all installations of electrical wiring and equipment.

Initial Registration

Form:
Instructions:
  • Complete both applications
  • For the Electrical Contractor Trade Application:
    • If the applicant is the Master Electrician (Contractor of Record) then complete parts A & C only
    • If the applicant is not the Master Electrician (Contractor of Record) then complete parts A & B only, the Master Electrician will fill out part C
    • All signatures must be notarized
Filing Method:

Mail

Agency Fee:
  • $91 exam fee
    • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for and schedule the exam
  • $82 license fee
    • If an applicant passes the exam they will be notified via US mail and will need to come down in person to pay the licensing invoice. The license will be issued immediately upon payment.
Notarize:Required
Required Attachments:
  • Driver's License or State ID of the Electrical Contractor of Record
  • Copy of Master Electrician's (Contractor of Record) License
  • Partnerships & Corporations: List of all names, addresses, and titles of partners and officers on notarized letterhead signed by the contractor of record
  • Passport-sized picture of contractor of record

Registration Renewal

Form:
Filing Method:

Mail

Agency Fee:
  • $82 license fee
  • $37 registration fee
Due:

Annually by December 31

Required Attachments:
  • Copy of Electrical Contractor's License
  • Copy of Master Electrician's (Contractor of Record) License
  • Partnerships & Corporations: List of all names, addresses, and titles of partners and officers on notarized letterhead signed by the contractor of record

City of Detroit Elevator Contractor License & Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Elevator Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:
  • Current & Valid City of Detroit Unlimited or Limited Elevator Journeyperson License
  • 6 years of continuous work experience in the elevator field or an apprenticeship program, engaged in construction, service, maintenance, or modernization work of elevators, escalators, dumbwaiters, moving walks, etc.
    • One year of this experience may be waived if an applicant possesses a degree in Electrical or Mechanical Engineering from a recognized college or university

Initial Registration

Form:
Instructions:

Complete both applications

Filing Method:

In-person

Agency Fee:
  • $117 exam fee (written)
  • $128 exam fee (oral)
  • $195 license fee (unlimited and limited)
    • This fee is due once an applicant has passed both the written and oral exam
Notarize:Required
Notes:
  • Only 1 type of license can be selected on an application. An applicant can hold more than 1 license but must wait a period of time after obtaining one license before applying for an additional type of license.
  • Applicant's whose credentials are from out of state can expect longer processing times
Required Attachments:
  • Driver's License or State ID of the applicant
  • Signatures and license numbers of at least 2 City of Detroit Elevator Journeypersons who can attest to the applicant's experience and habits in elevator work
  • Letter of verification from current employer stating applicant's number of years and dates of employment
  • Letter of verification from the applicant's skilled trade representative of an organization or a certificate of completion from a recognized education program or an equivalent elevator Journeyperson license

Registration Renewal

Form:

Application for Renewal or Registration of Contractor License

Agency Fee:

$195

Due:

Annually by December 31

Notarize:Required

City of Detroit Fire Alarm Contractor License & Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:

The applicant must either hold a current and valid Fire Alarm Technician's License or hire a current and valid Fire Alarm Technician that will be employed full time by the applicant. The Fire Alarm Technician shall be actively in charge of and responsible for Code compliance of all installations of electrical wiring and equipment performed by the electrical fire alarm contracting company.

Initial Registration

Form:
Instructions:
  • If the applicant is a Fire Alarm Technician then complete parts A & C only
  • If hiring a Fire Alarm Technician then complete parts A & B only, the fire alarm technician will fill out part C
  • All signatures must be notarized
Filing Method:

Mail

Agency Fee:
  • $85 exam fee
    • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for and schedule the exam
  • $82 license fee
    • If an applicant passes the exam they will be notified via US mail and will need to come down in person to pay the licensing invoice. The license will be issued immediately upon payment. 
Notarize:Required
Required Attachments:
  • Driver's License or State ID of the Electrical Fire Alarm Contractor of Record
  • Copy of Fire Alarm Contractor License issued by the State of Michigan or the City of Grand Rapids
  • Copy of Master Fire Alarm Technician's License issued by the State of Michigan or the City of Grand Rapids, if applicable
  • Partnerships & Corporations: List of all names, addresses, and titles of partners and officers on notarized letterhead signed by the contractor of record
  • Passport-sized picture of contractor of record

Registration Renewal

Form:
Filing Method:

Mail

Agency Fee:

$82

Due:

Annually by December 31

Required Attachments:
  • Copy of Fire Alarm Contractor License issued by the State of Michigan or the City of Grand Rapids
  • Copy of Master Fire Alarm Technician's License issued by the State of Michigan or the City of Grand Rapids, if applicable
  • Partnerships & Corporations: List of all names, addresses, and titles of partners and officers on notarized letterhead signed by the contractor of record

City of Detroit Mechanical Contractor Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Mechanical Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:

Applicant must have a current and valid State of Michigan Master Mechanical/Mechanical Contractor License before applying for a registration with the City of Detroit.

Initial Registration

Form:

Mechanical Registration Form - Application for Renewal or Registration of Contractor License

Filing Method:

Mail or online

Agency Fee:

$23

Notarize:Required
Required Attachments:
  • Driver's License or State ID of the applicant
  • Copy of the State of Michigan Master Mechanical/Mechanical Contractor License

Registration Renewal

Form:

Mechanical Registration Form - Application for Renewal or Registration of Contractor License

Filing Method:

Mail or online

Agency Fee:

$23

Due:

Triennially by the associated state-level license renewal

Notarize:Required
Required Attachments:
  • Driver's License or State ID of the applicant
  • Copy of the State of Michigan Master Mechanical/Mechanical Contractor License

City of Detroit Plumbing Contractor Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Plumbing Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:

Applicant must have a current and valid State of Michigan Master Plumbing License/Plumbing Contractors License before applying for a registration with the City of Detroit. If the applicant only holds a Plumbing Contractors License, they must hire a Master Plumber before applying for a registration.

Initial Registration

Form:

Application for Renewal or Registration of Contractor License

Filing Method:

Mail or online

Agency Fee:

$22

Notarize:Required
Required Attachments:
  • Driver's License or State ID of the applicant
  • Copy of the State of Michigan Master Plumbing License and Plumbing Contractor License

Registration Renewal

Form:

Application for Renewal or Registration of Contractor License

Filing Method:

Mail or online

Agency Fee:

$22

Due:

Annually by the associated state-level license renewal

Notarize:Required
Required Attachments:
  • Driver's License or State ID of the applicant
  • Copy of the State of Michigan Master Plumbing License and Plumbing Contractor License

City of Detroit Residential Builder & Residential Maintenance & Alteration Contractor Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Building Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:

Applicant must possess a current and valid State of Michigan Residential Builder or Residential Maintenance & Alteration Contractor License

Initial Registration

Form:

Building License Registration or Renewal

Filing Method:

Mail or online

Agency Fee:

$46

Notarize:Required
Required Attachments:
  • Driver's License or State ID of the applicant
  • Copy of the State of Michigan Residential Builder or Residential Maintenance & Alteration Contractor

Registration Renewal

Form:

Building License Registration or Renewal

Filing Method:

Mail or online

Agency Fee:

$46

Due:

Triennially by the associated state-level license renewal

Notarize:Required

City of Detroit Sign Erector License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Building Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Building License Registration or Renewal

Instructions:
  1. Call the Building Division to set up an appointment to take the necessary exam
  2. An applicant will be notified if they pass the exam and will then be required to pay the necessary license fee
Filing Method:
  • Mail
  • License fees can be paid online
Agency Fee:

$46

Notarize:Required

Registration Renewal

Form:

Buildings License Registration or Renewal

Filing Method:
  • Mail
  • License fees can be paid online
Agency Fee:

$46

Due:

Annually by date of issuance

Notarize:Required

City of Detroit Sign Specialist Contractor License & Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:

The applicant must hold a current and valid Sign Specialist's License or hire a licensed Sign Specialist that will be employed full time by the applicant. The Sign Specialist shall be actively in charge of and responsible for Code compliance of all installations, maintenance, connection, and repair of electric signs and related wiring.

Initial Registration

Form:
Instructions:
  • Complete both application forms
  • For the Electrical Contractor Trade Application:
    • If the applicant is a Sign Specialist then complete parts A & C only
    • If hiring a Sign Specialist then complete parts A & B only, the Sign Specialist will fill out part C
    • All signatures must be notarized
Filing Method:

Mail

Agency Fee:
  • $85 exam fee
    • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for and schedule the exam
  • $82 license fee
    • If an applicant passes the exam they will be notified via US mail and will need to come down in person to pay the licensing invoice. The license will be issued immediately upon payment. 
Notarize:Required
Required Attachments:
  • Driver's License or State ID of the Sign Specialist Contractor of Record
  • Copy of the Sign Specialist Contractor of Record's License
  • Partnerships & Corporations: List of all names, addresses, and titles of partners and officers on notarized letterhead signed by the contractor of record
  • Passport-sized picture of contractor of record

Registration Renewal

Form:
Filing Method:

Mail

Agency Fee:
  • $82 license fee
  • $38 registration fee
Due:

Annually by December 31

Required Attachments:
  • Copy of Sign Specialist's License
  • Partnerships & Corporations: List of all names, addresses, and titles of partners and officers on notarized letterhead signed by the contractor of record

City of Detroit Steeplejack License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Building Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Building License Registration or Renewal

Instructions:
  1. Call the Building Division to set up an appointment to take the necessary exam
  2. An applicant will be notified if they pass the exam and will then be required to pay the necessary license fee
Filing Method:
  • Mail
  • License fees can be paid online
Agency Fee:

$46

Notarize:Required

Registration Renewal

Form:

Buildings License Registration or Renewal

Filing Method:
  • Mail
  • License fees can be paid online
Agency Fee:

$46

Due:

Annually by date of issuance

Notarize:Required

City of Detroit Window Washer License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Building Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Building License Registration or Renewal

Instructions:
  • Call the Building Division to set up an appointment to take the necessary exam
  • An applicant will be notified if they pass the exam and will then be required to pay the necessary license fee
Filing Method:
  • Mail
  • License fees can be paid online
Agency Fee:

$46

Notarize:Required

Registration Renewal

Form:

Buildings License Registration or Renewal

Filing Method:
  • Mail
  • License fees can be paid online
Agency Fee:

$46

Due:

Annually by date of issuance

Notarize:Required

City of Detroit Wrecking Contractor License & Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Building Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Insurance Requirements:
  • Liability Insurance in amounts not less than:
    • Class A: $250,000 for injury or death of any one person and $500,000 for injury or death to more than one person
    • Class B & C: $100,000 for injury or death of any one person and $300,000 for injury or death to more than one person
  • Property Damage Insurance in amounts not less than:
    • Class A: $250,000
    • Class B & C: $100,000
  • Aggregate:
    • Class A: $500,000
    • Class B & C: $300,000
  • Worker's Compensation Insurance
Bond Requirements:

$50,000 surety bond

Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:

Class A & B Unrestricted + Class C: State of Michigan Builder or Residential Maintenance and Alteration Contractor License with wrecking classification

Initial Registration

Form:

Class A Wrecking License Application

Class B & Class C Wrecking License Application

Instructions:
  1. Submit electronic copies of the Certificate of Insurance and Surety Bond to the Law Department online
  2. Submit Completed Application Packet to the Building Inspection Division and pay the application review fee
    1. All applications must be received 14 days before any Board meeting to be considered at that meeting
  3. Pay for and take the written wrecking license exam
  4. Pay license fee online
Filing Method:

Mail

Agency Fee:
  • $214 application review fee
  • $116 exam fee
    • This fee is due once the City of Detroit Board of Wrecking Conttractors Examiners approves the applicant to sit for the exam
  • $90 license fee
    • This fee is due once an applicant has passed the exam
Notarize:Required
Required Attachments:
  • Driver's License or State ID of the applicant
  • Recent passport-style photo of the applicant
  • State of Michigan Builder's License or Residential Maintenance & Alterations License with wrecking classification
  • Bond approval letter from Business License Center Division
  • Permits with photos as evidence of experience in demolition
  • Employment Affidavit (included in application packet)
Bond Amount:

$50,000

Registration Renewal

Form:

Application for Renewal or Registration of Contractor License

Filing Method:
  • Mail
  • Electronic copies of the Certificate of Insurance and Surety Bond can be submitted online
  • License fees can be paid online
Agency Fee:

$90

Due:

Annually by December 31

Notarize:Required
Required Attachments:
  • Bond approval letter from Business License Center Division
  • State of Michigan Builder's License or Residential Maintenance & Alterations License with wrecking classification
Bond Amount:

$50,000

City of Holland Contractor Registration

Agency:City of Holland (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Contractor Registration

Filing Method:

Mail 

Required Attachments:
  • A copy of your contractor’s license(s).

Registration Renewal

Form:

Contractor Registration

Filing Method:

Mail 

Due:

Annually by the date of issuance.

Required Attachments:
  • A copy of your contractor’s license(s)

City of Wyoming Contractor Registration

Agency:City of Wyoming (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Contractor Registration Form

Filing Method:

Mail 

Agency Fee:
  • Master Plumber $15
  • Eectrical $60 
  • Fire Alarm Speciality $60
  • Mechancial $15
  • Sign Speciality $60
Required Attachments:
  • Copy of your current Contractor’s License

Registration Renewal

Form:

Contractor Registration Form

Filing Method:

Mail 

Agency Fee:
  • Master Plumber $15
  • Eectrical $60 
  • Fire Alarm Speciality $60
  • Mechancial $15
  • Sign Speciality $60
Due:

Annually by the date of issuance. 

Lansing Building Wrecker’s/Mover’s License

Agency:Lansing City Clerk's Office (MI)
Foreign Qualification is Prerequisite:Not Set
Insurance Requirements:

$100,000 for injury or death to any one person, $300,000 if more than one person, and $100,000 property damage. The City of Lansing must be shown as an additional insured.

Bond Requirements:

$10,000 Indemnity bond

Notes:

No person, firm or corporation shall engage in the business of demolishing or moving buildings or other structures within the City of Lansing without first obtaining a license from the City authorizing the holder thereof to carry on or engage in such business.

Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Building Wrecker or Building Mover Printable Application

Filing Method:

Mail or online.

Agency Fee:

$175

Required Attachments:
  • Proof of insurance
  • Proof of bond

Registration Renewal

Form:

Building Wrecker or Building Mover Printable Application (Renewal)

Filing Method:

Mail or online.

Agency Fee:

$100

Due:

Annually

Required Attachments:
  • Proof of insurance
  • Proof of bond

Individual Licenses

Michigan Individual Construction and Contracting Licenses

Michigan Asbestos Abatement Contrator/Supervisor Accreditation

Agency:Michigan Occupational Safety and Health Administration - Asbestos Program
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$50

Registration Renewal

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$25

Due:

Annually by the date of issuance.

Michigan Asbestos Abatement Inspector Accreditation

Agency:Michigan Occupational Safety and Health Administration - Asbestos Program
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$150

Registration Renewal

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$75

Due:

Annually by the date of issuance.

Michigan Asbestos Abatement Management Planner Accreditation

Agency:Michigan Occupational Safety and Health Administration - Asbestos Program
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$150

Registration Renewal

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$75

Due:

Annually by the date of issuance.

Michigan Asbestos Abatement Project Designer Accreditation

Agency:Michigan Occupational Safety and Health Administration - Asbestos Program
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$150

Registration Renewal

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$75

Due:

Annually by the date of issuance.

Michigan Asbestos Abatement Worker Accreditation

Agency:Michigan Occupational Safety and Health Administration - Asbestos Program
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$50

Registration Renewal

Form:

Asbestos Abatement Accreditation Application

Agency Fee:

$25

Due:

Annually by the date of issuance.

Michigan Boiler Installer License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Application for Boiler Installer's or Repairer's Examination

Agency Fee:

$100 exam fee + $80 license fee

Registration Renewal

Agency Fee:

$80

Due:

Annually by December 31.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Boiler Operator License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Application for Boiler Operator or Stationary Engineer Examination and Registration

Agency Fee:

$50 applicaiton fee + $80 if applying for either Low Pressure OR High Pressure status and additional $80 if applying for BOTH High and Low Pressure status.

Registration Renewal

Agency Fee:

$80

Due:

Annually by December 31.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Boiler Repairer License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Application for Boiler Installer's or Repairer's Examination

Agency Fee:

$100 exam fee + $80 license fee

Registration Renewal

Agency Fee:

$80

Due:

Annually by December 31.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Electrical Contractor License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Filing Method:

Online

Agency Fee:

$300

Due:

Triennially by December 31.

Michigan Electrical Journeyman License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Agency Fee:

$40

Due:

Annually by December 31.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Elevator Journeyperson License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Application for Elevator Examinations

Agency Fee:

$100 Exam fee and $40 license fee

Notarize:Required

Registration Renewal

Agency Fee:

$40

Due:

Annually by the date of issuance.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Fire Alarm Specialty Technician License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Agency Fee:

$50

Due:

Annually by December 31.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Journeyman Plumber License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Agency Fee:

$40

Due:

Annually by April 30.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Lead Inspector Certification / License

Agency:Michigan Department of Health and Human Services - Healthy Homes Section
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No
Qualifying Individual Requirements:
  • 1-year related experience + bachelor’s degree; OR
  • 2-years’ related experience + associates degree; OR
  • 3-years’ related experience + high school diploma

Initial Registration

Form:

Lead Inspector/Risk Assessor Registration Application 

Filing Method:

Mail 

Agency Fee:

Determined by date applied. Option 1 : March - August $475. Option 2 September - February  $325 

Notes:

If applying for reciprocity, verify out of state training meets Michigan requirements outlined in Act 333.5468 and Rules 325.99301 – 325.99304 by contacting the Department at 517-335-9390 or HHSInfo@Michigan.gov.

Before you Apply:

The Michigan Lead Abatement Act requires individuals engaging in lead-based paint activities be certified through the Michigan Department of Health and Human Services (MDHHS) prior to conducting work.

Registration Renewal

Form:

Lead Inspector/Assessor Renewal Application 

Filing Method:

Mail 

Agency Fee:

$300 renewal fee + $125 exam fee = $425

Due:

Annually by March 30. 

Michigan Maintenance and Alteration Contractor Individual License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Filing Method:

Online

Agency Fee:

$150

Due:

Triennially by May 31.

Michigan Master Electrician License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Agency Fee:

$50

Due:

Annually by December 31.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Master Plumber License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Agency Fee:

$300

Due:

Triennially by April 30.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Mechanical Contractor License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Application for Mechanical Contractor Examination & Licensing

Filing Method:

Mail or online.

Agency Fee:

$300

Registration Renewal

Filing Method:

Online

Agency Fee:

$300

Due:

Triennially by August 31.

Michigan Plumbing Apprentice Registration

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Registration for Plumbing Apprentice

Agency Fee:

$15

Registration Renewal

Agency Fee:

$15

Due:

Annually by April 30.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Michigan Residential Builder Individual License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Filing Method:

Online

Agency Fee:

$150

Due:

Triennially by May 31.

Michigan Sign Specialist License

Agency:Michigan Department of Licensing and Regulatory Affairs (LARA) - Bureau of Construction Codes - Licensing Division
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Registration Renewal

Agency Fee:

$40

Due:

Annually by December 31.

Notes:

A renewal notice is sent prior to expiration-no form on website.

Local Construction and Contracting Individual Licenses

Branch County Electrical Contractor's License Registration

Agency:Branch County Building Department (MI)
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Electrical Contractor’s License Registration

Agency Fee:

$15

Required Attachments:
  • A copy of your state license
  • Certificate of liability insurance

Registration Renewal

Form:

Electrical Contractor’s License Registration (Renewal)

Agency Fee:

$15

Due:

Registrations are valid for the remainder of the contractor's state license cycle.

Required Attachments:
  • A copy of your state license
  • Certificate of liability insurance

Branch County Mechanical Contractor's License Registration

Agency:Branch County Building Department (MI)
Foreign Qualification is Prerequisite:Not Set
Exam Required?Not Set
Registered Agent (Special Agency) Required?Not Set

Initial Registration

Form:

Mechanical Contractor’s License Registration

Agency Fee:

$15

Required Attachments:
  • A copy of your state license
  • Certificate of liability insurance

Registration Renewal

Form:

Mechanical Contractor’s License Registration (Renewal)

Agency Fee:

$15

Due:

Registrations are valid for the remainder of the contractor's state license cycle.

Required Attachments:
  • A copy of your state license
  • Certificate of liability insurance

City of Detroit Boiler Operator License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Boiler/Pressure Vessel Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Boiler Operator Trade Application

Filing Method:

Mail or in person

Agency Fee:
  • $139 exam fee
  • $59 license fee
    • This fee is due once an applicant has passed the necessary exam
Notarize:Required
Notes:

Photocopies of the application and required documents will be accepted for scheduling purposes. An applicant must present the originals on the date of examination for verification.

Required Attachments:
  • Driver's License or State ID of the applicant
  • Notarized proof of employment letter from current employer on company letterhead signed by the company official OR;
  • Certificate of Completion from an approved school

Registration Renewal

Form:

Boiler Operator Trade Application

Filing Method:

Mail

Agency Fee:

$59

Due:

Annually by date of issuance

City of Detroit Electrical Apprentice Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Electrical Apprentice Application

Filing Method:

Mail

Agency Fee:
  • $21
  • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for the registration
Notarize:Required
Required Attachments:
  • Driver's License or State ID
  • Passport-sized picture of the applicant
  • Proof of Detroit Residency
  • Documentation of current and valid participation in a bonafide Apprentice Training Program approved by the Board documenting a minimum of 144 hours for each academic year
  • Notarized letter(s) on company letterhead from employer(s) attesting to the employment related to electrical construction or maintenance of buildings or electrical wiring or equipment obtained under the direct supervision of a person licensed by the City of Detroit, City of Grand Rapids, or the State of Michigan
    • Letters must contain start and end dates of employment, number of hours worked, and a brief description of your experience or duties

Registration Renewal

Electrical Apprentice Registration Renewal
Form:

Electrical Apprentice License Renewal

Filing Method:

Mail

Agency Fee:

$21

Due:

Annually by September 30

Notarize:Required
Required Attachments:
  • Driver's License or State ID
  • Proof of Detroit Residency
  • Documentation of current and valid participation in a bonafide Apprentice Training Program approved by the Board documenting a minimum of 144 hours for each academic year
  • Notarized letter(s) on company letterhead from employer(s) attesting to the employment related to electrical construction or maintenance of buildings or electrical wiring or equipment obtained under the direct supervision of a person licensed by the City of Detroit, City of Grand Rapids, or the State of Michigan
    • Letters must contain start and end dates of employment, number of hours worked, and a brief description of your experience or duties

City of Detroit Electrical Journeyman License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Application for Electrical Journeyman License

Filing Method:

Mail

Agency Fee:
  • $77 exam fee
    • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for and schedule the exam
  • $60 license fee
    • If an applicant passes the exam they will be notified via US mail and will need to come down in person to pay the licensing invoice. The license will be issued immediately upon payment. 
Notarize:Required
Required Attachments:
  • Driver's License or State ID
  • Passport-sized picture of applicant
  • Proof of Detroit Residency
  • Notarized letter(s) on company letterhead from employer(s) attesting to the required 8,000 hours of practical experience obtained over 4 years under the direct supervision of a person licensed by the City of Detroit, City of Grand Rapids, or the State of Michigan
    • Letters must contain start and end dates of employment, number of hours worked, a brief description of your experience or duties, the Master Electrician's license number, and the city in which the Master Electrician holds their license

Registration Renewal

Filing Method:

Mail

Agency Fee:

$60

Due:

Annually by December 31

City of Detroit Elevator Journeyperson License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Elevator Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Application for License as Elevator Journeyperson or Contractor

Filing Method:

In-person

Agency Fee:
  • $118 exam fee (written)
  • $128 exam fee (oral)
  • $59 license fee (unlimited and limited)
    • This fee is due once an applicant has passed both the written and oral exam
Notarize:Required
Notes:
  • Only 1 type of license can be selected on an application. An applicant can hold more than 1 license but must wait a period of time after obtaining one license before applying for an additional type of license.
  • Applicants whose credentials are from out of state can expect longer processing times
Required Attachments:
  • Driver's License or State ID of the applicant
  • Signatures and license numbers of at least 2 City of Detroit Elevator Journeypersons who can attest to the applicant's experience and habits in elevator work
  • Letter of verification from current employer stating applicant's number of years and dates of employment
  • Letter of verification from the applicant's skilled trade representative of an organization or a certificate of completion from a recognized education program or an equivalent elevator Journeyperson license

Registration Renewal

Agency Fee:

$59

Due:

Annually by December 31

City of Detroit Fire Alarm Apprentice Registration

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Fire Alarm Apprentice Registration

Filing Method:

Mail

Agency Fee:
  • $21
  • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for the registration
Notarize:Required
Required Attachments:
  • Driver's License or State ID
  • Passport-sized picture of the applicant
  • Proof of Detroit Residency
  • Documentation of current and valid participation in a bonafide Apprentice Training Program approved by the Board documenting a minimum of 144 hours for each academic year
  • Notarized letter(s) on company letterhead from employer(s) attesting to the required 8,000 hours of practical experience obtained over 4 years under the direct supervision of a person licensed by the City of Detroit, City of Grand Rapids, or the State of Michigan
    • Letters must contain start and end dates of employment, number of hours worked, a brief description of your experience or duties, the Fire Alarm Technician's license number, and the city in which the Fire Alarm Technician holds their license

Registration Renewal

Form:

Fire Alarm Apprentice Renewal

Filing Method:

Mail

Agency Fee:

$21

Due:

Annually by September 30

Notarize:Required
Required Attachments:
  • Driver's License or State ID
  • Passport-sized picture of the applicant
  • Proof of Detroit Residency
  • Documentation of current and valid participation in a bonafide Apprentice Training Program approved by the Board documenting a minimum of 144 hours for each academic year
  • Notarized letter(s) on company letterhead from employer(s) attesting to the required 8,000 hours of practical experience obtained over 4 years under the direct supervision of a person licensed by the City of Detroit, City of Grand Rapids, or the State of Michigan
    • Letters must contain start and end dates of employment, number of hours worked, a brief description of your experience or duties, the Fire Alarm Technician's license number, and the city in which the Fire Alarm Technician holds their license

City of Detroit Fire Alarm Technician License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Fire Alarm Technician Application

Filing Method:

Mail

Agency Fee:
  • $85 exam fee
    • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for and schedule the exam
  • $82 license fee
    • If an applicant passes the exam they will be notified via US mail and will need to come down in person to pay the licensing invoice. The license will be issued immediately upon payment. 
Notarize:Required
Required Attachments:
  • Driver's License or State ID
  • Passport-sized picture of contractor of record
  • Proof of Detroit Residency
  • Notarized letter(s) on company letterhead from employer(s) attesting to the required 8,000 hours of practical experience obtained over 4 years under the direct supervision of a person licensed by the City of Detroit, City of Grand Rapids, or the State of Michigan
    • Letters must contain start and end dates of employment, number of hours worked, a brief description of your experience or duties, the Fire Alarm Technician's license number, and the city in which the Fire Alarm Technician holds their license
  • Proof of certification for NICET Associate of Engineering Technician, Level II, or the equivalent (as determined by the board)

Registration Renewal

Form:

Fire Alarm Technician Renewal

Filing Method:

Mail

Agency Fee:

$82

Due:

Annually by December 31

Required Attachments:
  • Copy of Master Fire Alarm Technician's License issued by the State of Michigan or the City of Grand Rapids, if applicable

City of Detroit Master Electrician License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Master Electrician Application

Filing Method:

Mail

Agency Fee:
  • $77 exam fee
    • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for and schedule the exam
  • $82 license fee
    • If an applicant passes the exam they will be notified via US mail and will need to come down in person to pay the licensing invoice. The license will be issued immediately upon payment
Notarize:Required
Required Attachments:
  • Driver's License or State ID
  • Passport-sized picture of contractor of record
  • Documentation of current and valid participation in a bonafide Apprentice Training Program approved by the Board
  • Notarized letter(s) on company letterhead from employer(s) attesting to the employment related to electrical construction or maintenance of buildings or electrical wiring or equipment obtained under the direct supervision of a person licensed by the City of Detroit, City of Grand Rapids, or the State of Michigan
    • Letters must contain start and end dates of employment, number of hours worked, and a brief description of your experience or duties

Registration Renewal

Form:

Master Electrician Application

Filing Method:

Mail

Agency Fee:

$82

Due:

Annually by December 31

Notarize:Required

City of Detroit Refrigeration Operator License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Boiler/Pressure Vessel Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Boiler Operator Trade Application

Instructions:

Bring the completed application and necessary documents to the written exam, which is conducted every 2nd and 4th Monday of the month. You MUST arrive promptly at 8:00 am or you will not sit for the examination. 

Filing Method:

In person

Agency Fee:
  • $105 exam fee/class of license (written)
  • $139 exam fee/class of license (oral)
  • $59 license fee
    • This fee is due once an applicant has passed the written and oral exam
Notarize:Required
Notes:

If the written exam is passed, an applicant will be notified and given an appointment for the oral exam. 

Required Attachments:
  • Driver's License or State ID of the applicant
  • Notarized proof of employment letter from current employer on company letterhead signed by the company official OR;
  • Certificate of Completion from an approved school

Registration Renewal

Form:

Boiler Operator Trade Application

Filing Method:

Mail

Agency Fee:

$59

Due:

Annually by date of issuance

City of Detroit Sign Specialist License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Electrical Inspections Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Sign Specialist Application

Filing Method:

Mail

Agency Fee:
  • $85 exam fee
    • This fee is not due until an application has been approved. Once approved, an applicant will be notified via US mail and will need to come down in person to pay for and schedule the exam
  • $76 license fee
    • If an applicant passes the exam they will be notified via US mail and will need to come down in person to pay the licensing invoice. The license will be issued immediately upon payment. 
Notarize:Required
Required Attachments:
  • Driver's License or State ID
  • Passport-sized picture of contractor of record
  • Proof of Detroit Residency
  • Notarized letter(s) on company letterhead from employer(s) attesting to the required 4,000 hours of practical experience obtained over 2 years under the direct supervision of a person licensed by the City of Detroit, City of Grand Rapids, or the State of Michigan
    • Letters must contain start and end dates of employment, number of hours worked, a brief description of your experience or duties, the Sign Specialist's license number, and the city in which the Sign Specialist holds their license
  • Proof of successful completion of a Sign Specialty Training course concerning the installation, maintenance, connection, or repair of electric signs and related wiring as shown in the Sign Electrician's Workbook published by the American Technical Publishers, Inc.; or any other course designed to address the installation, maintenance, connection, or repair of electric signs and related wiring, as approved by the Board

Registration Renewal

Filing Method:

Mail

Agency Fee:

$76

Due:

Annually by December 31

City of Detroit Stationary Engineer License

Agency:City of Detroit Buildings, Safety Engineering and Environmental Department - Boiler/Pressure Vessel Inspection Team (MI)
Foreign Qualification is Prerequisite:No
Exam Required?Not Set
Registered Agent (Special Agency) Required?No

Initial Registration

Form:

Boiler Operator Trade Application

Instructions:

Bring the completed application and necessary documents to the written exam, which is conducted every 2nd and 4th Monday of the month. You MUST arrive promptly at 8:00 am or you will not sit for the examination. 

Filing Method:

In person

Agency Fee:
  • $105 exam fee/class of license (written)
  • $139 exam fee/class of license (oral)
  • $59 license fee
    • This fee is due once an applicant has passed the written and oral exam
Notarize:Required
Notes:

If the written exam is passed, an applicant will be notified and given an appointment for the oral exam. 

Required Attachments:
  • Driver's License or State ID of the applicant
  • Notarized proof of employment letter from current employer on company letterhead signed by the company official OR;
  • Certificate of Completion from an approved school

Registration Renewal

Form:

Boiler Operator Trade Application

Filing Method:

Mail

Agency Fee:

$59

Due:

Annually by date of issuance

Explore Licensing in Other States

Associated General Contractors of America
Professional association providing advocacy and organization for construction firms and workers.

National Association of Home Builders
National association for the promotion of the housing industry.

National Association of State Contractors Licensing Agencies
National organization that represents and promotes the interests of state level contractor licensing agencies.